Consulting Services DMC
Consulting Services
There will be 3 (three) consultancy packages. They are: Design and Management Consultancy (DMC); Financial Capacity Building Consultancy (FCBC); and Project Performance Monitoring and Evaluation Consultancy (PPMEC).
DMC
The D&M consultants will assist the PMU in managing the Project, preparing the detailed design, supervising the works, and ensuring the technical quality of design and construction. The D&M consultants also will conduct the feasibility study for future water source development, and will prepare preliminary design and tender documents.

Selection of Design & Management Consultants (DMC):
- EoI published: 13 November 2007
- EoI received : 06 January 2008
The following twelve firms submitted EOI within the stipulated time and among them six firms was short-listed.
Sl Nr |
List of firms submitted EOI proposals |
Status of short-listing |
1. |
SWECO International AB, Sweden JV with BCEOM, France & HIFAB International AB, Sweden in association with DPC, DUL, Bangladesh |
Non-qualified |
2. |
POYRY Environment GmbH, Germany joint venture with Operation Research Group Pvt. Ltd., India and DDC Ltd., Bangladesh. |
Qualified |
3. |
Scott Wilson India Pvt Ltd. (SW), India in association with KBR, Australia & SODEV Consultant, Bangladesh |
Non-qualified |
4. |
Uniconsult international Ltd., Bangladesh JV with PT Multi Area Conindo (MACON), Indonesia |
Non-qualified |
5. |
Pacific Consultants International Asia Inc., Philippines joint venture with SMEC, Australia and in association with ACE, Bangladesh and HB Consultant, Bangladesh. |
Qualified |
6. |
Grontmij | CarlBro, Denmark joint venture with AQUA Consultant and Associates Ltd., Bangladesh; BETS Consulting Services Ltd., Bangladesh & IWM Institute of Water Modeling, Bangladesh. |
Qualified |
7. |
Indus Associated Consultants (Pvt) Ltd, Pakistan in association with Modern Engineers & Planners & Consultants Ltd. Bangladesh |
Non-qualified |
8. |
SNC-LAVALIN International Inc., Canada joint venture with Shah Technical Consultants Pvt. Ltd., India and in association with BCL, Bangladesh. |
Qualified |
9. |
Intercontinental Consultants & Technocrats Pvt. Ltd., India joint venture with SARM Associates Ltd., Bangladesh. |
Qualified |
10. |
GHD Pty Ltd. Australia |
Non-qualified |
11. |
STUP Consultants P. Ltd., India JV with COWIAS, Norway & association with MSL, DPM & KAL, Bangladeshh |
Non-qualified |
12. |
Cowater International Inc. (Canada) JV with TCIL, Bangladesh, Wilber Smith Associates, USA & Juretera Perunding ZAABA Sdn. Bhd., Malaysia |
Qualified |
|
- The deadline for submission of RFPs was upto 14:00 hrs of 24/06/2008. By that period, 5 (Five) firms submitted the RFPs. Each proposal for the Design and Management Consultancy has 2 (two) parts. They are: Technical Proposal and Financial Proposal. In a scale of 100%, under the given QCBS method, the weightage shall be Technical Proposal 80% (eighty percent) and financial proposal 20% (twenty percent). All the five firms were qualified technically as they secured more than the qualifying mark 750.
- The public opening was held on October 20, 2008, Monday in presence of the authorized representatives of the firms presided over by Managing Director of Dhaka WASA. The result of combined evaluation is as follows:
FIRM NAME |
Ranking in Combined Evaluation |
Grontmij | CarlBro, Denmark JV with AQUA, BETS & IWM Bangladesh |
1st |
Intercontinental Consultants & Technocrats Pvt. Ltd. India JV with SARM Bangladesh. |
5th |
POYRY Environment GmbH, Germany JV with ORG, India & DDC, Bangladesh |
4th |
Pacific Consultants Philippines JV with SMEC., Australia, in association with ACE, HB, Bangladesh.. |
2nd |
| SNC-LAVALIN Int'l Inc, Canada JV with Shah Technical Consultants Pvt Ltd, India and in association with BCL, Bangladesh. |
3rd |
|
-
The contract negotiation was held on 30 November’08 to 4 December’08. A draft contract has been signed between Grontmij | CarlBro, Denmark JV with AQUA, BETS & IWM Bangladesh and Dhaka WASA on 4 December’08.
-
Dhaka WASA Board endorsed the contract on 15 February’2009
-
CCGP approved the proposal on 12 May 2009
-
Prime Minister approved the proposal on 27 May 2009
-
Contract signed on 30 June 2009
-
Consultant mobilization starts on 20 July2009
|